WTC rebuilding costs come in at lower end of projections: Port Authority

The final price tag for the project will be around $15B

TRD New York /
Feb.February 22, 2016 08:04 AM

Contrary to skeptics’ warnings, the effort to rebuild the World Trade Center did not go massively over budget.

The total cost of the redevelopment, over a decade in the making, will come in at the low end of the $14.8 billion-to-$15.8 billion estimate made in 2012, according to Steve Plate, head of major capital projects at the Port Authority of New York and New Jersey.

The new WTC’s steel-winged, Santiago Calatrava-designed transit hub, called the Oculus – which will open the first week of March – will have a final cost between $3.7 billion and $3.99 billion, equal to the 2012 estimate, which was commissioned by the Authority’s board amid widespread criticism of cost overruns at the Downtown project, Bloomberg reported.

The 365,000-square-foot Oculus will connect 11 subway lines, the PATH train, several bus lines and ferries. It will serve about 200,000 passengers, about a third of the number served by Penn Station.

“We had an obligation to do something special,” Plate said, according to Bloomberg. “We did it very prudently and intentionally to give the best quality, the best product and the best structure that we could provide to the city of New York. And we’re very proud to report that we feel very strongly that that mission has been accomplished.” [Bloomberg]Ariel Stulberg


Related Articles

arrow_forward_ios
The total market value of all properties in New York City was at about $1.4 trillion (Credit: iStock)

Market value of NYC real estate went up at slowest rate in years

A Victoria's Secret store in New York (Credit: Getty Images)

Victoria’s Secret sues WTC landlord amid store closures and layoffs

The architect claims the design, construction and marketing of the tower rips off the design of a tower he planned and modeled for his thesis

Lawsuit over WTC design is whittled down

Adam Neumann in talks about his future role, Sheldon Solow’s son makes a winery play: Daily digest

Adam Neumann in talks about his future role, Sheldon Solow’s son makes a winery play: Daily digest

Santiago Calatrava with the Constitution Bridge in Venice and the Oculus (Credit: Getty Images)

It’s not just the leaking Oculus: Santiago Calatrava hit with suit over Venice bridge

LMDC and the Port Authority will each appraise the site independently (Credit: REX and CityRealty)

Final 5 WTC site to hit the market following lengthy dispute between agencies

Attorney General Letitia James and World Trade Center under construction (Credit: Getty Images)

Ex-Cushman & Wakefield manager charged in WTC bribery scheme

The World Trade Center Transportation Hub (Credit: Unsplash)

The Oculus’ $32M skylight has ripped

arrow_forward_ios
Loading...